doolgunna feasibility study

  • Doolgunna CopperGold Mine Mining Technology

    The project is owned by Sandfire Resources In July 2010, OZ Minerals gained a 19% stake in Sandfire Resources This deal enabled OZ to control the Doolgunna project Sandfire approved the DeGrussa project in March 2011 and completedGreater Doolgunna Project, WA 5 MOD T3 Feasibility Study ASX Announcement, dated 28 March 2019, Page 23 T3 Site Layout4 Pit Shell per Feasibility Study Slide: 13 Sandfire EMEA │ T3 –Advanced Development Asset For personal use only Significant Landholding (~11,700km2)For personal use only ASXDOOLGUNNA CUAU PROJECTS (JV WITH SANDFIRE RESOURCES NL) The Doolgunna CuAu Projects Joint Venture is between the Company and Sandfire, with Sandfire acting as Joint • Commencement of a feasibility study by the Joint Venture Since the discovery of high grade coppergold mineralisation in drill hole TLDD0004A in early 2015, theFor personal use only Diversity in Copper and Nickel

  • Report: Sandfire Resources Building a postDeGrussa

    Mar 28, 2018· The 920,000 tonnes of ore contain approximately 150 million pounds of copper, and although this is a pretty small resource, the definitive feasibility study completed on Monty was good enough for Sandfire’s board to greenlight the development of the projectFeasibility Study Exploration • Multipronged exploration programs continuing across Sandfire’s Greater Doolgunna Project Sandfire’s aggregate contiguous exploration area, including Joint Venture and Farmin arrangements, increased during the quarter to 6,588km 2 as a result of the Alchemy Resources Ltd FarminLODGEMENT OF SEPTEMBER 2018 QUARTERLY REPORT,